3D
2015 CAT 349FL
Crawler Excavators · 8,500 hrs
» Audio description — Minnesota: listen
Tell us the jobsite and the dirt type — we'll tell you which machine makes you money in Grand Rapids. Every unit here ships to Grand Rapids and the rest of Itasca County: real photos, real hours, serial numbers on the listing, and priced with real numbers, not 'call for price'. Roughly 1,062 miles out of our yard, so figure 4–7 business days by lowboy with permits where required door to door. Grand Rapids sits 1,062 miles from our yard — close enough that delivery is easy, and we deliver there weekly.
Grand Rapids may be a small market — but that's exactly why delivery matters more: one truck, one machine, straight to the job (1,062 miles, 4–7 business days by lowboy with permits where required). north Minnesota work leans on septic and grading crews — the machines on this page are the ones that fit.
For landscaping and earthmoving near Grand Rapids, we point crews to excavators first — ours ship 4–7 business days by lowboy with permits where required.
Fun fact: the 1,062-mile haul from our yard to Grand Rapids is shorter than the drive some crews make between their own jobsites.
3D
Crawler Excavators · 8,500 hrs
3D
Mini Excavators · 1,500 hrs
3D
Crawler Dozers · 8,800 hrs
3D Parts / Salvage
3D
Padfoot Compactors · 4,000 hrs
3D
Off-Highway Trucks · 18,359 hrs
3D
Track Skid Steers · 2,990 hrs
3D
Crawler Excavators · 1,276 hrs
3D
Crawler Excavators · 9,500 hrs
3D
Crawler Excavators · 5,800 hrs
About 1,062 miles from our yard, so typically 4–7 business days by lowboy with permits where required. Weather and permits can move it a day or two on oversize loads; we quote the real window when you call.
Yes — Grand Rapids is 1,062 miles from our yard, well inside the 1,500-mile map. Delivery runs 4–7 business days by lowboy with permits where required.
We make it right — documented condition in the listing, and if it arrives in Grand Rapids not as described, call us immediately and we resolve it.
Yes — oversize/overweight permits are arranged by our transport partners before the truck rolls; it's built into the freight quote.