3D
2013 CAT 930K
Wheel Loaders · 8,900 hrs
» Audio description — Maine: listen
Third-party inspections welcome before anything leaves the yard for 04015. We haul to 04015 4–7 business days by lowboy with permits where required — lowboys and step decks, permits handled. Our yard is 1,036 miles out; that puts 04015 in the 4–7 business days by lowboy with permits where required window with trucks moving weekly.
Fun fact: Casco sits 1,036 miles from our Forest Park yard — that's a shorter haul than most of the Southeast.
3D
Wheel Loaders · 8,900 hrs
3D
Off-Highway Trucks · 14,500 hrs
3D
Crawler Dozers · 8,000 hrs
3D Parts / Salvage
3D
Padfoot Compactors · 1,400 hrs
3D
3D
Telehandlers · 4,600 hrs
3D
Crawler Excavators · 9,500 hrs
3D
Crawler Dozers · 11,600 hrs
It depends on the machine class and your access, so we quote it with the machine — one number covering freight and equipment.
Typically 4–7 business days by lowboy with permits where required from our yard (1,036 miles). Oversize loads can add a day or two for permits — quoted honestly when you call.
Often, yes — tell us the spec and we'll hunt the market with you.
Everything we list — from mini excavators to haul trucks. Tell us the job and we'll match the machine and the trailer.