3D
2013 CAT 930K
Wheel Loaders · 8,900 hrs
» Audio description — Massachusetts: listen
Tell us the job — we'll tell you the right machine for 02018 terrain and access. The machines our Accord-area buyers take most: excavators and dozers for dirt work, skid steers for cleanup, and wheel loaders for material. We drop off to 02018 3–5 business days by lowboy or step deck — lowboys and step decks, permits handled.
Fun fact: the 946-mile haul from our yard to Accord is shorter than the drive some crews make between their own jobsites.
3D
Wheel Loaders · 8,900 hrs
3D
Off-Highway Trucks · 14,500 hrs
3D
Crawler Dozers · 8,000 hrs
3D Parts / Salvage
3D
Padfoot Compactors · 1,400 hrs
3D
3D
Telehandlers · 4,600 hrs
3D
Crawler Excavators · 9,500 hrs
3D
Crawler Dozers · 11,600 hrs
Wire for the machine balance, deposit to reserve; financing through partners on most units.
It depends on the machine class and your access, so we quote it with the machine — one number covering freight and equipment.
Yes — every ZIP code within our 1,500-mile map, including the neighbors of 02018.
Yes — 946 miles from our yard, 3–5 business days by lowboy or step deck.